As part of cost certainty, Newills are able to provide cost control services which begins at inception and concludes with the settlement of the final account to meet the client’s requirement.
A strict cost control discipline measure is used throughout all stages of design through construction to ensure that the initial estimate, tender figure and final account
In achieving this, we employ various methods and procedures to control the costs during the pre-contract and post-contract stages of a project, with the sole aim of ensuring the client benefits on value for money, realise a sensible design expenditure between the various elements of the project and minimize the client’s expenditure within the agreed sum.
The strict cost control measures used throughout all stages of the design and construction ensures that the initial estimate, tender figure and final account sum are all closely related.
In keeping the client informed on the status of each project, a periodic/monthly cost report or financial statement report detailing the reconciliation between cost and value of all project in its current stage is provided to enable the client to anticipate and control their current and future financial project commitments.
